Rosen Plaza – Gary Sain Memorial Bridge

When the design of the connector bridge between the Rosen Plaza and the Orlando Convention Center was being conceived, we were brought in during the design phase to develop a roof system that would provide meet the wind pressures of an open structure requiring minimal supporting steel. We developed a panel system requiring only three purlins (one on each end and one centerline (at the top of the apex) and no ceiling. We fabricated and installed Merchant & Evans Zip-Rib .050 Aluminum panels and did so in a fashion that reduced construction time and minimized road closures.

When faced with extreme design criteria and in need of “out of the box”, unconventional thinking, contact the Professionals at RoofSmith!!!!!

other projects

Get Started on Your Roof Repair Today!

Contact RoofSmith of Tampa Bay now for fast, reliable roofing solutions—our team is ready to assist you!

How can we assist you today?
Property Information
Contact Information

Apply Today!

Join our team today and start your career with RoofSmith of Tampa Bay!